Blog

Belt Conveyor Care: Tracking, Splices and Cleaning

2026-08-22 | by ABC Company
p1

BC-1200 is test-run in the plant, but floor fall twists frames. Level the legs, square the pulleys, then tension.

Slippery splices usually mean oil or a loose belt. Skip silicone cleaners on food PU belts. Hardware lines need a drop guard so parts do not jam the rail.

Check tracking each shift and motor current weekly. Rising current often means packed debris, not a “bad motor.”

Popular Tags

Equipment Selection Line Upgrade

Frequently Asked Questions

View all →

We issue invoice, packing list, contract and technical data. Certificate of origin, inspection or embassy legalization is extra by country. Tell us any HS-code preference so the goods description matches your license.

Standard VMC-850 and AP-400 builds take about 25–40 days. Conveyors follow meter count; robot cells follow gripper complexity. Rush jobs are answered after we check castings and electrical stock—no empty “next week” promises.

Machines ship in export wooden or steel-frame crates with moisture and rust protection. Marks, port and fumigation follow your forwarder. Precision parts are boxed separately with a packing list for arrival checks.

Get Free Quote